The Masai solar project is a USD 520 million solar energy investment project comprising of two sites: the Narok 100 MW Solar PV with Battery Energy Storage System (BESS) and the Suswa 300 MW Solar PV with BESS, totaling 400 MW. Development commenced in 2020 under a consortium led by SIC Investment, ACCIONA Energía Global, and Barwasim Africa Consulting Ltd. Both sites integrate advanced BESS technology to ensure grid stability and reliability, allowing storage of up to 200 MWh of power for peak demand use.
The project will deliver sustainable, low-cost energy to the national grid while promoting local job creation, technology transfer, and community electrification. Strategically positioned near Suswa substation, the project will also strengthen transmission reliability between Narok and Nairobi, directly supporting Kenya’s 100% clean energy ambition by 2030.
Project value
$520Mn
Sectors
Infrastructure
Project stage
Validated concept
County
Narok
The dam is designed to store 15.5 million cubic meters (Mm³) of water and irrigate 7,333 hectares of farmland, benefiting…
The project involves constructing a 52-meter-high roller-compacted concrete (RCC) gravity dam with a crest length of 300 meters and a…
Kisumu convention centre is currently 85% completed, designed to be a comprehensive hub for events and recreation
Develop a 200‑acre life sciences park at Konza operating under a privately initiated Public Private Partnership (PPP) model to ensure…

Invest Kenya Chatbot
Investment Kenya does not warrant the accuracy, reliability or completeness of any information provided by the chatbot, and assumes no liability or responsibility whatsoever for any errors or omissions in such information. Invest Kenya does not warrant that the information provided by the chatbot is up-to-date, and any information sourced from third parties has not been independently verified. Use of the chatbot is at your own risk. Please do not insert personal data.